Shore Land Zone Permits: Effective as of September 30, 2010, all plumbing permit applications for property in the shore land zone must require prior approval from the Planning Board before the plumbing permit is issued by the Local Plumbing Inspector. To receive a plumbing permit for a subsurface septic system, you need 3 copies of the HHE 200 form (which is the design papers prepared by the soil evaluator). External Plumbing Permit (Issued by Local Plumbing Inspector) Internal Plumbing Permit (Issued by Local Plumbing Inspector) Department of Environmental Protections Permit: Permit required for certain situations DEP Phone: (207) 287-3901 DEP Link: https://www.maine.gov/dep/contact/index.html Each permit requires its own fee. |